1 |
3-02-001-18 |
Method of storage of semi-finished products like ingots, blooms, billets, slabs |
123.54 KB |
2 |
3-02-002-18 |
Method of reconditioning of sinter plant pallets |
128.35 KB |
3 |
3-02-003-18 |
Code of practice for mounting and dismounting of bearings (Hindi version also available) |
2.21 MB |
4 |
3-02-004-18 |
Code of practice for storing, handling and reclamation of lubricants |
127.41 KB |
5 |
3-02-005-18 |
Method of reconditioning of blast furnace bells |
216.6 KB |
6 |
3-02-006-18 |
Definition of terms relating to maintenance & equipment performance |
136.69 KB |
7 |
3-02-007-18 |
Method of packing, identification & storage of finished long products |
22.17 KB |
8 |
3-02-008-18 |
Method of periodic maintenance of WDS-6 locomotives in steel plant |
326.01 KB |
9 |
3-02-010-18 |
Method of storage of flat products |
482.72 KB |
10 |
3-02-011-18 |
Code of practice for vibration monitoring |
256.8 KB |
11 |
3-02-012-18 |
Wear particle analysis procedure for establishing a system |
19.57 KB |
12 |
3-02-013-18-A |
Method of permanent way inspection and maintenance practices of rail track (Part-A) |
465.52 KB |
13 |
3-02-013-18-B |
Method of permanent way inspection and maintenance practices of rail track (Part-B) |
289.41 KB |
14 |
3-02-014-18 |
Code of practice for revamping of EOT cranes |
244.33 KB |
15 |
3-02-015-18 |
Code of practice for inspection of Industrial Building Steel Structures. |
300.28 KB |
16 |
3-02-017-18 |
Reconditioning of coke crusher roll (for base mix preperation) |
122.18 KB |
17 |
3-02-018-18 |
Reclamation of Roll Table Rollers |
129.07 KB |
18 |
3-02-019-18 |
Code of Practice for Reclamation of Blast Furnance Hot Blast Valves |
374.73 KB |
19 |
3-02-021-18 |
Code of Practice for Raw Material Spillage Control |
708.54 KB |